Optional project milestones

This Document can be found in the following categories:

Overview

PDWare administrators define default phases and milestones in the Phase and Milestone list tables. These are database wide defaults; every project has these phases and milestones automatically at project creation.

A PDWare administrator can also define a list of optional milestones in the Lookup List table in the Administer Lists module. The list can contain as many milestones as needed and practical. The maximum number of milestones for each project remains limited to 30.

If such a list has been defined, anyone with project modification rights can:

  • open the Status module for a project
  • Right click a cell in the Milestone name range
  • select one or more milestones from the list
  • post completion dates for the miilestones, and
  • Submit Status.


The optional milestones will be present whenever the Status module is opened for that project.

Creating a list of optional milestones (Administrator only)

Using optional milestones in the Status module